Most cost overruns on a house are decided long before the foundation is poured. They are decided in the weeks when nobody wrote anything down. This guide covers the sequence we recommend to owners planning a house in Haldwani, and what to settle at each point.
1. Confirm the land before you design
Before you spend money on drawings, confirm what the plot will actually allow. Boundary dimensions on paper and boundary dimensions on the ground are not always the same, and a half-metre difference can change a room layout.
Check access for construction vehicles as well. A plot on a narrow lane changes how material is delivered and what that delivery costs.
- Verify the boundary and the actual measured area
- Confirm ownership documents and any encumbrances
- Check the ground and slope, particularly on hill-side plots
- Check vehicular access for material delivery
2. Get drawings before you get estimates
An estimate without drawings is a guess. It is also the single most common cause of disputes later, because both sides remember the scope differently.
At a minimum you want an architectural layout and a structural design before you ask anyone to price the work. With those, two contractors can be compared on the same basis.
3. Build the budget in stages
A single lump sum for 'the house' hides where the money actually goes. Breaking it into stages makes it possible to see what each stage costs and where you have room to adjust.
Finishing is where budgets move most. Structure costs what it costs; flooring, joinery and fittings can vary by a wide margin depending on what you choose.
- Site preparation and excavation
- Foundation and plinth
- RCC structure
- Masonry and plastering
- Electrical and plumbing
- Flooring, joinery and painting
- External works and boundary wall
4. Agree the programme and the payment stages together
Payment linked to completed stages keeps both sides honest. It gives the contractor working capital as the work progresses, and it gives you a measurable trigger before each release.
Build in a realistic allowance for monsoon weeks. A programme that assumes uninterrupted work through the rainy season is a programme that will slip.
5. Decide finishes earlier than feels necessary
Finish decisions affect earlier trades. Where a shower will go decides where the plumbing runs; where a wall-mounted light will hang decides where the conduit is laid.
Deciding these during the masonry stage rather than after plastering avoids cutting into finished walls.